OPTRUSS
[MIGRATION TRIGGERS: ACTIVE] // MEAN TIME TO INTERVENTION // THRESHOLD EXCEEDED

The warning signs your current CMMS is costing you millions.

Industrial facilities rarely replace their CMMS until a catastrophic failure forces their hand. If your maintenance operations suffer from administrative dispatch lag, blind MRO stockouts, or unpredicted asset trips, your current software is an active operational hazard.

FINANCIAL EXPOSURE AUDIT // CONTINUOUS PROCESS PLANT$4,387,800 ANNUAL EXPOSURE
AUDITED SITE PARAMETERS: 420 Critical Rotating Assets // $45,000 / hr Down-Cost // 84 hrs Historical Downtime
>> Annual Unplanned Downtime Cost: $3,780,000
>> Administrative Work-Order Triage Latency: 1,420 hours ($127,800)
>> Emergency MRO Expedited Shipping Penalties: $480,000
TOTAL AVOIDABLE OPERATIONAL LOSS: $4,387,800 / YEAR
PROJECTED AUDITED IMPACT WITH OPTRUSS:
>> Net Annual Recovered Operating Margin: $3,326,160
>> Projected Payback Window: 41 Operating Days
Operational Triggers

When Is It Time to Replace Legacy Systems?

TRIGGER 01

Critical Asset Trips Without Diagnostic Warning

If a boiler feed pump or turbo-compressor seizures without an automated warning 14+ days in advance, your condition monitoring stack is broken. Static SCADA thresholds miss bearing fatigue.

Optruss gives 45+ days of advance warning on bearing wear
TRIGGER 02

The 4-Hour Work Order Administrative Choke

When an operator identifies an anomaly, how long before a technician arrives with the correct parts, tools, and LOTO permissions? If tickets sit waiting for supervisor triage, you run a bottleneck.

Slashes dispatch latency from 4.2 hours to < 350ms
TRIGGER 03

Blind MRO Inventory Stockouts During Critical Repairs

When equipment stops, locating required seals or bearings shouldn't require searching three warehouses. If your CMMS doesn't link live wear curves to reorder triggers, you bleed capital on shipping.

Reduces expedited freight spend by 82% within 90 days
41 Days
Average Payback Window
-82%
Expedited Freight Cost
350ms
Dispatch Triage Time
14 Days
Zero-Downtime Migration

Stop waiting for the next catastrophic failure.

Book a confidential migration feasibility review. Our systems architects will evaluate your existing database schemas and fieldbus infrastructure to build a guaranteed 14-day migration plan.